The Notion agency.One workspace, fully used.
Opened blank, Notion turns into a maze of orphan pages nobody trusts. We design the architecture, build the relational databases with relations, rollups and the right views, add templates and automations, then migrate and train each team so the workspace gets adopted.
★★★★★Verified Trustpilot reviews · AI, automation & growth agency
ActiveCampaign
Adalo
AdCreative.ai
Ahref
Airtable
Allo (The Mobile First Company)
Apify
Apollo.io
Attio
Attio Implementation Partner
Base44
Baserow
Brevo
Bright Data
Browse AI
Bubble
CaptainData
ChatGPT
Claude
Claude Code
Claude Cowork
Claude Design
Clickup
Cursor
DeepSeek
Dust
ElevenLabs
Fillout
Flutterflow
Folk CRM
Folk Implementation Partner
Freepik Spaces
Gamma
GeminiA Notion agency designs the system, not just decorates pages.
Anyone can buy the seats and drop in a template. Architecting a workspace that scales, building databases that connect, and getting the team to actually use it is a different job. Here are the four things we own.
- Workspace architecture
A Notion workspace designed to scale, not sprawl
A blank Notion turns into a maze of orphan pages in a month. We design the structure first: teamspaces by function, wikis for the knowledge that goes stale otherwise, project hubs, and a page hierarchy a new hire can navigate on day one. Permissions are set so the right people see the right pages and clients only see theirs. You get a workspace built to grow with the team, not one you outgrow in a quarter.
See a typical workspace - Databases & automations
Databases, relations and rollups that actually connect
The power of Notion is relational data, and it is where most workspaces fall apart. We build the databases that run your work (lightweight CRM, projects and tasks, content calendar, docs), link them with relations and rollups so a number updates everywhere at once, and set the views that fit each team (table, board, calendar, timeline). Then we add formulas, buttons and database automations so the busywork stops being manual.
See the method - Templates & Notion AI
Templates and Notion AI for the work you repeat
Half the value of Notion is never re-creating the same page twice. We build database templates and template buttons for your recurring work (a new project, a client onboarding, a meeting note, a spec) so the structure is identical every time. We wire Notion AI where it earns its place: drafting, summarising long pages, querying your wiki, and we set synced blocks so one source of truth shows up across pages instead of going out of date.
See the integrations - Rollout & adoption
Rolled out so the team actually works in it
A gorgeous workspace nobody opens is dead weight, and adoption (not setup) is what decides success. We migrate your existing content, train each team on the views and databases they use, write the wiki that documents how the workspace works, and connect the API and integrations to the tools you already run. We are an automation and AI agency first, so this plugs into how your team already operates instead of fighting it.
See AI enablement
We build a Notion workspace like a system, not a scrapbook.
Most Notion rollouts die the same way: a blank workspace, a few enthusiastic pages, no architecture, no relations, and three months later it is a maze nobody trusts so the team drifts back to spreadsheets. So we treat it like a system: structured teamspaces, relational databases, templates and automations, and a rollout that trains each team on the part they use.
- Audit · map how your team works today and where the workspace falls apart
- Architecture · teamspaces, wikis, page hierarchy and permissions, built to scale
- Build · relational databases, views, templates, formulas and automations
- Rollout · migrate, train each team, and document it so adoption sticks
We run our company in Notion every day.
We do not sell a certification tier. We run our own work in Notion: wikis, a lightweight CRM, project hubs and dashboards, so we design the workspace the way it actually gets used, with relations and rollups that hold and a structure that scales. That is exactly what is missing when a build ends at a pretty homepage and a template nobody maintains.
- We run our own company in Notion every day, so we design the workspace the way it actually gets used, not the way a template gallery suggests.
- Adoption-first by default: we migrate, train and document, because a workspace nobody opens is the most common way a Notion rollout dies.
- You leave autonomous: the structure, templates and wiki live in your workspace, so your team owns it and extends it without us.
- No certification to sell. We are judged on whether your team actually works in the workspace after we leave, not on a partner badge.
Notion at the core, your way of working around it.
We build the parts that turn a blank workspace into a connected system, then wire it to how your team already works. Here is what a real build covers.
- Setup
Teamspaces & wikis
We structure the workspace into teamspaces by function and build the wikis that hold your processes, brand and onboarding, so knowledge stops living in someone's head and new hires find it themselves.
- Setup
Relational databases
We build the databases that run your work and link them with relations and rollups, so your CRM, projects, content and docs talk to each other and a status update propagates instead of being copied by hand.
- Setup
Views & dashboards
We set the right view per team (table, board, calendar, timeline) and build dashboards that surface what each role needs, with filters and sorts so people see their work, not the whole database.
- Setup
Templates & buttons
We build database templates and template buttons for your recurring pages, plus buttons that create and pre-fill records, so the structure is identical every time and nobody starts from a blank page.
- Setup
Formulas & automations
We write the formulas and configure the database automations that kill the manual busywork: status rollups, date math, auto-assignment, notifications, so the workspace updates itself within Notion.
- Setup
Notion AI & API
We wire Notion AI for drafting, summaries and wiki search where it earns its place, and connect the Notion API and integrations to your stack so data flows in and out instead of being re-keyed.
We map how your team works, you leave with a plan.
Before quoting anything, we take 60 minutes to look at how your team works today and where information gets lost. You leave with an honest read on what Notion should run for you, what to architect first, and where it is not the right fit. Zero pitch, just a frank take on your workspace.
- An honest read on what Notion should run for your team
- The architecture and permissions to design first
- The databases, relations and automations worth building
- A frank take on where Notion is the wrong fit
How we run a Notion workspace build.
Five steps, in order. We do not build a database before the architecture is signed off, we do not call it done before the team is working in it, and your team owns it at the end. Each step has a deliverable and you sign off before we move on.
- Step 1 · Workspace audit
Map how your team works and where Notion falls apart
We sit down with your team and look at how work actually flows today: where information gets lost, the spreadsheets duct-taping the gaps, the pages nobody can find. We check your current Notion (or the tools you want to replace) and your real processes. Half the value is telling you what Notion fixes and what it does not, so you do not move a workflow into a tool that will not hold it.
- Step 2 · Architecture
Design the structure before building a single database
We design the workspace first: teamspaces by function, the wikis that hold your knowledge, project hubs, and a page hierarchy people can navigate without a map. We set permissions so the right people see the right pages and clients only see theirs. Someone on your side signs off on the structure before we build, because re-architecting a workspace full of data later is the expensive mistake.
- Step 3 · Build the system
Databases, views, templates and automations
We build the relational databases that run your work and link them with relations and rollups, set the right view per team (table, board, calendar, timeline), and add the formulas, buttons and database automations that kill the manual busywork. Templates make every recurring page identical, and synced blocks keep one source of truth from going stale across the workspace.
- Step 4 · Connect it
Wire Notion AI, the API and your other tools
We wire Notion AI where it earns its place (drafting, summaries, querying your wiki) and connect the Notion API and integrations so data flows between Notion and the tools you already run, instead of being re-keyed by hand. If you publish externally, we set up Notion Sites so a page or database becomes a public site without a separate build.
- Step 5 · Roll out & hand over
Migrate, train each team, then get out of the way
We migrate your existing content, train each team on the views and databases they actually use, and write the wiki that documents how the workspace works so new hires inherit it. Adoption, not setup, is what decides success, so we do not call it done until the team is working in it. If you want us on call for what scales next, we talk about that separately.
We're judged on the workspace they live in.
No certification badge to display, so we lead with what matters: feedback from the teams whose Notion workspace we built, and whether they kept working in it after we left. Our Trustpilot reviews come from those teams, not from a marketing deck.
- The structure, templates and wiki live in your workspace, owned by your team
- Relations and rollups designed so data stays connected
- Each team trained on the views and databases they use
- Trustpilot reviews come from the teams we built it for
The questions we get asked on repeat.
What does a Notion agency actually do?
A Notion agency designs, builds and rolls out a workspace your team actually works in, instead of leaving you with a blank Notion and a template gallery. We architect the teamspaces, wikis and page hierarchy, build the relational databases with relations, rollups and the right views, add templates, formulas and database automations, wire Notion AI and the API to your stack, then migrate your content and train each team. The point is a workspace the team adopts, not a pretty page nobody opens.How much does a Notion workspace build cost?
It depends on scope: a single-team wiki and a couple of databases is nothing like a full company workspace with a lightweight CRM, project hubs, dashboards and API integrations. We do not throw out a flat package. We start with a free 60-minute audit to find what Notion should actually run for you, then quote a fixed scope. The Notion subscription itself you pay Notion directly per seat; we design the workspace so you are not paying for plan tiers you do not need.Is Notion the right tool for us, or are we forcing it?
Honest answer: Notion is excellent as a connected workspace for docs, wikis, lightweight databases and projects, but it is not a true relational database and not a heavy project-management tool at scale. If you need complex SQL-style queries, thousands of linked rows recomputing in real time, or hard resource-planning and Gantt dependencies for hundreds of tasks, a dedicated tool fits better. Part of the audit is telling you where Notion is the right fit and where it is not, before you commit.Can you connect Notion to our other tools with the API?
Yes. The Notion API lets data flow in and out, so your workspace is not an island. We connect it to the tools you already run (forms, CRM, calendar, email, automation platforms) so records get created and updated without re-keying, and we set up the integrations that push the right data into the right database. Where it helps, we wire Notion AI to draft, summarise long pages and answer questions from your wiki. The goal is Notion fitting into your stack, not replacing everything overnight.What are relations and rollups, and why do they matter?
Relations link records across databases (a task to its project, a deal to its company), and rollups pull a value from the linked records up to where you need it (total hours on a project, deals per account). They are what turn Notion from a pile of pages into a connected system where one update propagates everywhere instead of being copied by hand. Most workspaces that feel messy are missing this layer. Designing relations and rollups well is the difference between a workspace that scales and one that sprawls.Will you migrate our existing content into Notion?
Yes, and we do it as part of the rollout, not as an afterthought. We move your existing docs, spreadsheets and the tools you are replacing into the new structure, map old data into the right databases, and clean up the duplication that built up over the years. Migration is where a lot of workspace projects stall, so we plan it in batches: the team gets a useful, populated workspace early instead of waiting on a big-bang import before anyone can use it.How long does a Notion workspace project take?
For a scoped build (architecture, core databases, key templates and training), count a few weeks: audit and structure first, then databases and automations, then migration and training. A full company workspace with a CRM, project hubs, dashboards and API integrations runs longer. We split into batches so your team is working in a useful part of the workspace early, rather than waiting on the whole thing before anyone opens it.Do you train our team or just build the workspace?
Both, and the training is where adoption is won or lost. A workspace nobody knows how to drive gets abandoned for the old spreadsheet. We train each team on the views, databases and templates they actually use, write the wiki that documents how the workspace works so new hires inherit it, and stay available while the team finds its feet. Setup is the easy half; getting people to genuinely work in Notion is the half that decides whether the project paid off.
Stop fighting a blank Notion. Build it right.
A 60-minute audit, how your team works mapped, a workspace plan with the architecture and adoption baked in. If your team can run it in-house after the build, we'll hand you the playbook. If we're the right fit, we handle it.